24
- ]
[1 ]
12.04.2015
What if the crane didn’t come? Wait until the winner? that is. Shorten the construction time? This is correctly done proof that instead of the Russians Uzbek older left
and *******
Fuck... And the man didn’t write in Russian, that another job, which also needs to be done by doping was? And you could first do it, and then look at the circumstances, what was there with the crane. In fact, it turned out that people suffered half a day of unnecessary hernia, the crane did this job in a few minutes, and the work that was to be done did not.
If the crane did not come... And if they had to raise the concrete plates, and the crane did not come, would they also raise them? If you plan work, based on the abstract "if", you will fit in time and generally do something normal.