A new road from the street of Podolsk and Kharkov street to the MKAD will open in the south of Moscow in September this year.
The total length of the highway is 5.4 km. General designer – JSC "Mosinzhprojekt", general contractor – JSC "Dormost". The cost of construction is 3.6 billion rubles.
It turns out that a kilometer of road costs 666 666 666,666 rubles.